1. ELECTRIC ENERGY
Legislative updates
Decree N°324/2011.
National Executive Branch (PEN). Treasury’s contributions to electricity sector
companies. By the referred decree, published in the
Official Gazette on January 2, 2012, the President of Argentina increased the
General Budget of the National Administration for the year 2011. Among the
entities that will profit from the budget allocation increase there are several
companies from the energy sector: (i) Compañía Administradora del Mercado
Eléctrico S.A. (CAMMESA), by approximately $500 million for the import of
electricity and combustibles for energy generation, transfers affected by
high-voltage power net broadening and current transfers for gas purchase-sale;
(ii) Yacyretá, by approximately $70 million; (iii) Nucleoeléctrica Argentina S.A.,
by approximately $200 million; and (iv) Energía Argentina S.A. (ENARSA), by
$100 million.
Resolution Nº13/2012.
Regulatory Entity for Electricity (ENRE). Generators. Measuring and recording
procedure of emissions to atmosphere. By the referred resolution, dated December 25,
2011 and published in the Official Gazette on February 2, 2012, the National
Regulatory Entity of Electricity adopted the "Measuring and recording
procedures of emissions to atmosphere". Furthermore, it adopted the
evaluation of the limit value fulfilment established by Resolution SEyM
N°108/2001, for generation power plants that have to perform specific controls
and for constant releases of gas emissions. These provisions are applicable to
generating, self-generating and/or co-generating members of the Wholesale
Electric Market.
Joint provision
Nº229/2011 of the Control and Management Undersecretariat (S.C.G.) and
Nº810/2011 of the Budget Undersecretariat (S.S.P.). Public utilities. Subsidies
elimination. By the stated joint provision, published in the
Official Gazette on December 12, 2011, subsidies are eliminated for
electricity, natural gas, drinking water and sewage treatment services. The
elimination of state subsidies is provided not only for residential users
included in the geographical zones established in Annex I of the mentioned
joint provision, but also for those living in a tower building (provided they
have a MPR, swimming pool, gymnasium and recreation areas), as of January 1rst,
2012.
Joint provision
Nº216/2011 of the Control and Management Undersecretariat (S.C.G.) and
Nº733/2011 of the Budget Undersecretariat (S.S.P.). Public Utilities Tariffs.
Voluntary resignation to subsidies. Through the referred joint provision, published
in the Official Gazette on December 12, 2011, the voluntary resignation to
state subsidies forms and affidavit regarding the need for subsidies are
approved, being established that the "Voluntary Resignation to Subsidies
Register" shall operate within the scope of the General Administration
Bureau.
Law Nº10097. Entre
Ríos Province. Financial trust establishment to
fund infrastructure works at the provincial electric system.The referred law, published in the Official
Gazette on January 24, 2012, authorized the Provincial Executive Branch to
enter into public credit operations amounting to $180,000,000 maximum, to fund
infrastructure works at the provincial electric system. Said investment will be structured through the
issuance of securities and/or debt certificates of a financial trust, for a
maximum ten-year term. For this purpose, the Executive Branch may assign and
transfer the fiduciary ownership to the Trust of the following goods: a) the
necessary monetary amounts to cancel the commencement expenses of the trust
establishment; b) up to 75% of the funds collected for the tariff charge
established for the Energy Development Fund of Entre Ríos province; c) the
amounts of money that the Executive Branch decides to allocate, being suggested
by the Secretary of Energy of the provincial administration, arising from said
Energy Development Fund, among others. Due to this fact, all those public
utilities that have been awarded the electric power distribution service and
collect the tariff charge for the Energy Development Fund shall directly
deposit the percentage determined by the Executive Branch in favour of trustee.
Furthermore, the amounts transferred by the Trust for the execution of works
will be considered as capital contribution of the Provincial Administration in
favour of concessionary companies.
2. HYDROCARBONS.
Legislative updates
National Law Nº 26732.
Hydrocarbons. Export. Extension. Through the referred law, enacted on December
27, 2011 and published in the Official Gazette on December 28, 2011, the
hydrocarbon export right created by the second paragraph of section 6º, Law
Nº25561 (Public Emergency and Foreign Exchange System Reform Law), was extended
for 5 years, as of its maturity, as well as the powers granted to the National
Executive Branch to fix the corresponding rates, powers that may be delegated
to the Ministry of Economy and Finance. In addition, the Law explains that such
rights are applicable to exports done from the Special Custom Area created by
National Law Nº19640 (Free Trade Zone Law).
Joint Resolutions
N°114/2011 and 115/2011 of the Secretary of Energy (SE) and N°31/2011 and
32/2011 of the Secretary of Agriculture, Livestock, Fisheries and Food
(S.A.G.P.). Hydrocarbon Easement. Compensations. Through the referred resolutions, dated
December 27, 2011 and published in the Official Gazette on February 2, 2012,
the compensatory amounts corresponding to Decree N°861/1996 were increased, for
hydrocarbon easements, consequential damages, loss of profit, control and
vigilance expenses inherent in hydrocarbon activities developed in the
provinces of Chubut, Santa Cruz, Tierra del Fuego, Antarctica and South
Atlantic Islands, and in the denominated Cuyana and Neuquina Basins. In
accordance with the referred resolutions, the increases shall be applicable as
of April 1st, 2011.
Resolution Nº112/2011.
Secretary of Energy (SE). Liquefied petroleum gas. Price Stability Agreement.
Extension. By the referred resolution, published in the
Official Gazette on January 5, 2012, the Secretary of Energy authorized the
extension of the bottled Liquefied Petroleum Gas (LPG) Price Stability
Agreement, considering -among other reasons- the results achieved as of its
implementation. Accordingly, the parties agreed to extend the agreement until
December 31, 2011, through the execution of the Second Addendum to the
Liquefied Petroleum Gas (LPG) Price Stability Agreement -butane and/or mix-,
bottled in cylinders of ten (10), twelve (12) and fifteen (15) kilogram
capacity, dated December 29, 2010.
Resolution Nº172/2011.
Secretary of Energy (SE). Natural Gas. Agreement with Producers. By the referred resolution, dated December 29,
2011 and published in the Official Gazette on January 5, 2012, the allocation
rules and other criteria, established by Resolution N°599/2011 of the Secretary
of Energy, were temporarily extended, in connection with the Agreement with
natural gas producers 2007-2011, aimed at meeting the local demand.
Resolution Nº113/2011.
Secretary of Energy (SE). Natural Gas. Subsidies of consumptions. The resolution approves the transfer to the
Fiduciary Fund for residential consumption subsidies of approximately $80
million Argentine pesos to pay the compensations corresponding to the second
and third quarter (avoided tariff compensations) and accrued until December
(current compensations) of 2011.
General Resolution
Nº3242. Tax Agency (AFIP). Gas. Taxable value. By the referred resolution, published in the
Official Gazette on December 29, 2011, the prices for natural gas that the
federal tax Authority –AFIP- will consider as value base of export destinations
for consumption, validated between September 24th and November 5th, 2011,
within the framework of the Total Energy Program, which are attached to the
mentioned resolution, are fixed.
Communication “A”
5262. Central Bank of Argentina. Currency settlement due to hydrocarbon and
mineral product export. By the referred communication, issued by the
CBA on December 30, 2011, the situation of the collections before the entering
into force of the obligation to settle currencies for hydrocarbon exports was
clarified. In this regard the communication established that: a) In the case of
the operations informed as fulfilled until and including 10.25.2011 the
entrance and settlement of the collections done from and including 10.26.2011
will correspond, even if the shipping license were reported as conformed in the
follow up provided under the previous communication; b) In the case of the
operations outstanding at the close of 10.25.2011, the entity may grant
conformance under the previous regime, up to the collected amounts until and
including 10.25.2011, provided the collection date is proved, and the received
funds correspond to the shipping license. For the outstanding balance to that
date, the entrance and settlement of the funds shall have to be proved in the applicable
terms, in order to grant shipping conformance.
3. MINING
Legislative updates
National Law Nº 26737.
Regime for protection of national domain over property, possession and holding
of rural lands. The goal of the referred law, published in the
Official Gazette on December 28, 2011, is to regulate the limits to the
ownership and possession of rural lands, whatever their use or end, by
foreigners –whether individuals or legal entities-, without affecting acquired
rights.
For the purpose of this law, a foreign person
is interpreted as:
- Foreign individuals, holding or not actual
domicile within Argentina, provided the exceptions stated in the law are not
applicable.
- Legal entities when more than 51% of the
capital stock or a portion thereof enough to prevail in corporate decisions,
regardless of the stock percentage, is held by foreign individuals or legal
entities. Furthermore, the following persons are included: a) legal entities
controlled by any foreign corporate entity through a percentage over 25% or the
votes required to determine the corporate will; b) foreign individuals or legal
entities who are not registered stockholders but act as such; c) companies
which issued negotiable obligations or debentures, thus allowing their lawful
foreign holders to increase their holding or convert them into shares in a
percentage superior to 25%, or creating majority decision making power
regardless of the percentage shareholding, when foreign individuals or entities
are involved; d) when property is transferred under a trust whose beneficiaries
are foreign individuals or legal entities in a percentage over 25%; and e)
unincorporated companies, business cooperation organizations, joint ventures or
any kind of business cooperation form where individuals or entities have a
share in a percentage higher than the one permitted by law.
- Foreign public entities.
- Associations under the same conditions to
those for legal entities.
Furthermore, the law establishes the following
limits to foreign ownership and possession:
- Generally,
a 15% limit to rural lands in the Argentine territory which may be owned or
possessed by foreigners.
- Regarding
foreigners of a same nationality, a 30% limit of the above-stated limit is
applied.
- Regarding
each owner, one thousand hectare limit or the equivalent according to the
location of the piece of land.
- Prohibition
of foreign ownership over lands bordering water bodies, as well as properties
located at security border zones.
Moreover, the law establishes a National
Registry of Rural Lands, operating within the Ministry of Justice and Human
Rights. Among its duties, the following are specified: a) keep the record of
data regarding rural lands owned or possessed by foreigners; and b) issue
certificates for any and all acts by which property or possession rights over
rural lands are transferred. Those who own or possess rural lands who are
foreigners shall have to state before this registry the existence of such ownership
or possession.
Law Nº4738. Río Negro
Province. Repeal Law Nº3981. Establishment of the Provincial Council for Mining
Environmental Assessment. The referred law, published in the Official
Gazette on January 5, 2012, repealed the provincial law Nº3981, which
established the prohibition of the use of cyanide and mercury in metal mineral
extraction, exploitation and/or industrialization process.Furthermore, by this law the Provincial Council
for Mining Environmental Evaluation is established, whose duty is to assess
environmental impact studies resulting from mining activity in the Province of
Río Negro. Such Council shall be formed by members of different fields of the
mining sector, including representatives of the enforcing authority, lawmakers,
NGOs and indigenous peoples. The new environmental impact assessment process
includes the following stages: a) environmental impact study; b) technical
report; c) provincial environmental council report; and d) public hearing.
Law Nº4736. Río Negro
Province. Adherence to National Law Nº26639. By the referred standard, the Province of Río
Negro adhered to the National Law N°26639, establishing the Minimum Standards
Regime for the Protection of Glaciers and Periglacial Environment.
Communication “A”
5262. Central Bank of Argentina (CBA). Currency settlement due to hydrocarbon
and mineral product export. By the referred communication, the CBA
clarified the situation of the collections before the entering into force of
the obligation to settle currencies for mineral product exports. In this regard
the communication establishes that: a) In the case of the operations informed
as fulfilled until and including 10.25.2011, the entrance and settlement of the
collections done from and including 10.26.2011 will correspond, even if the
shipping license were reported as conformed in the follow up provided under the
previous communication; b) In the case of the operations pending at the close
of 10.25.2011, the entity may grant conformance under the previous regime, up
to the collected amounts until and including 10.25.2011, provided the
collection date is proved, and the received funds correspond to the shipping
license. For the balance pending to that date, the entrance and settlement of
the funds shall have to be proved in the applicable terms, in order to grant
shipping conformance.
Jurisprudence
National Supreme
Court. Public Hearing. “Comunidad Aborigen de Santuario Tres Pozos y
otros c/Provincia de Jujuy s/Amparo”. Motion for protection of
constitutional rights. 12.27.2011. By virtue of the referred judgment, the CSJN
decided to hold a public and oral hearing for the Indigenous people of
Santuario Tres Pozos to express its grounds for requesting standing to be part
of the administrative files held in Secretary of Mining, pursuant to which
exploration and exploitation lithium and borate authorizations in the
Guayatayoc Lake, Salinas Grandes, subbasin zone were granted. In order to obtain such standing, the Indigenous
People of Santuario Tres Pozos filed a motion for protection of constitutional
rights before the CSJN, arguing that the salt mines supply the community with
natural resources of common use necessary for its subsistence. Furthermore,
they seek the issuance of a cautionary measure that will direct not to grant
administrative permits for mining prospection, exploration and exploitation at
the zone in question, as well as the suspension of already granted permits.
They grounded their requests under sections 6, 41, 75 of the Argentine
Constitution, under the Convention No. 169 of the International Labour
Organization (ILO) concerning Indigenous and Tribal Peoples, as well as the
National Law Nº25675 (General Law of the Environment).
4. ENVIRONMENT
Legislative updates
Law Nº14343. Buenos Aires
Province. Environment. Environmental liabilities
identification. Obligation to recover polluted sites. The referred standard, published in the
Official Gazette of the province on January 23, 2012, regulates the
identification of Environmental liabilities and the obligation to recover
polluted sites in the province of Buenos Aires. It establishes that the ones
responsible for recovering environmental liabilities and/or polluted areas will
be those in charge of the activity generating the damage and/or the owners of
the properties, in the event those in charge of the activity cannot be found.
In this respect, it is foreseen that the one responsible for the activity which
has caused the environmental liability may be exempted when the enforcing
authority unequivocally indicates that the environment affected by the
exploitation is in sound environmental condition. This standard also creates the Registry of
Environmental Liabilities and establishes in such regards that the enforcing
authority shall inform the Property Registry when an environmental liability is
recorded in the Registry of Environmental Liabilities, in order to have it in a
marginal note of the stated the latest domain record. Additionally, those who
want to stop or transfer their activities are compelled to perform an
"Environmental Closing Audit". As regards the sanctions for detected defaults,
the Law provides for disciplinary measures, fines, partial or total closure of
the establishment and cancellations of registrations with the enforcing
authority. Last of all, an Environment Provincial Fund (FOPROA) is created,
which will be managed by the enforcing authority and shall be composed of the
fines received for the application of sanctions to provincial environmental
laws.
Law Nº14321. Buenos
Aires Province. Sustainable Management of Waste from Electrical and Electronic
Equipment. By this law, published in the Official Gazette
of the province dated December 15, 2011, guidelines, obligations and
responsibilities for the sustainable management of Electrical and Electronic
Equipment Waste (WEEE) in the territory of the Province of Buenos Aires is
established. Furthermore, said law regulates the prevention in the WEEE production
and the promotion of reuse, recycling, assessment and reduction of its
environmental impact. The most relevant obligations of producers,
distributors and marketers of EEE are as follows: i) marking with EEE which are
put in the market; ii) establishment of systems for the reception of WEEE and
the transport of such to the authorized treatment centers; iii) counting with a
piece of land or center for the reception of WEEE, when the place where its
exhibition and sale is carried out comprises a surface greater than five
hundred square meters. Additionally, the Law also provides for the
establishment of a provincial registry where EEE agents shall be registered,
and to which producers and distributors shall provide information as well as
annually pay a special tax for WEEE management. The defaults to the provisions set forth in the
law may be sanctioned with disciplinary measures, fines, suspension of the
activity, closure of the facilities and permanent ending of the activity.
Law Nº4118. Autonomous
City of Buenos Aires. Incorporation of paragraph to Law N°2936 on outdoor
advertising. The referred law, published in the Official
Gazette of the city of Buenos Aires on January 24, 2012, establishes that for
outdoor advertising that due to its characteristics or class of technology used
generates a moving sensation in its message or images, regardless its size or
place, a visual impact assessment to the vehicular and pedestrian traffic shall
be filed, prior to the granting of any permit. This, in turn, is to be analyzed
by the Townscape Commission when granting or renewing the permissions. All the advertisements already installed
fulfilling the requirements of the previous paragraph shall be readjusted
between a 90-day term as of the publication of this law. Once said term has
elapsed the Administration of the City of Buenos Aires (G.C.B.A.) is empowered
to determine the expiration of such permits.
Jurisprudence
National Supreme
Court. Environment. Municipal regulatory power in environmental matters. “Provincia
de Santiago del Estero c/Cía. Azucarera Concepción S.A. y otro s/amparo”. Motion for protection of constitutional rights. 12.20.2011. The Province of Santiago del Estero and the
Ombudsman filed a motion for the protection of constitutional rights in the
federal venue of that jurisdiction, “Provincia de Santiago del Estero c/Cía.
Azucarera Concepción S.A. y otro s/amparo”, against two sugar companies so that
they cease the pollution of the lake Dique Frontal of Termas de Río Hondo due
to vinasse dumping into the affluent, and requested a cautionary measure to
stop the bioethanol production. The federal judge pronounced himself
incompetent to hear the case and forwarded to the National Supreme Court, which
dismissed the cautionary measure request since until that moment. In this
regard, it dismissed the cautionary measure but ordered a notice to the
National Secretary of Environment and Sustainable Development for it to notify
the advancement of the action plan for the ecosystem preservation in a
10-working-day term.
National Supreme
Court. Environment. Indiscriminate cutting of trees and woods. Local
powers. “Salas, Dino y otros c/Provincia de Salta y Estado Nacional s/amparo”. 12.13.2011. In the framework of the motion for protection
“Salas, Dino y otros c/Provincia de Salta y Estado Nacional s/amparo”, which
was initiated to have the immediate and final close of the clearing and
indiscriminate cutting of native woods in Salta ordered, and to have defendants
recover the environment, the National Supreme Court decided to render the
issued cautionary measure ineffective and to cease intervening in the case
file, since it was the Provincial Administration that had exercised its local
jurisdiction as regards natural resources generating a protective regime of
native woods to overcome the conflict, whereby the periculum in mora had lost
its entity.
Supreme Court of the
Province of Salta. Environment. Municipal regulatory power in environmental
matters. C.I.A.C.S.A. c./Municipalidad de la Ciudad de Salta –
amparo-recurso de apelación”. Motion to appeal. 09.02.2011. In the case “C.I.A.C.S.A. c./Municipalidad de
la Ciudad de Salta s/amparo - recurso de apelación”, decided on 09.02.2011, the
Court of Justice of the Province of Salta dismissed the motion filed by a
company exploiting a meat processing plant against the decision of the Appeal
Chamber, which had dismissed the motion for the protection of constitutional
rights filed by plaintiff against the municipal ordinance stating the removal
of the meat processing plant since it considered that the plant affected the
environment.
In order to take such a decision, the Court
understood that the challenged ordinance to reallocate the meat processing
plant was in line with the general principles regulating the, such as the
prevention and precaution principles. Furthermore, it recognized the existence
of a restricted environmental public order, where biological and social rights
and warranties were involved.