Firm: All
Practice Industry: All
Region: All
Country/ State: All
Tag: All
Lawson Lundell LLP | May 2009

Robertson v. West Fraser Timber Co. Ltd., 2009 BCSC 602 Employee not constructively dismissed when employer’s unilateral reduction in his remuneration was small and he waited too long to complain about changes to his duties. Robertson was employed by West Fraser Timber (“WFT”) and its predecessor Weldwood for twenty-nine years ...

Lawson Lundell LLP | October 2008

On September 23, 2008, the Western Climate Initiative (“WCI”) released its Design Recommendations for the WCI Regional Cap-and-Trade Program (the “Program”) ...

Lawson Lundell LLP | November 2007

On September 30, 2007, on its own motion and without notice, the Alberta Energy and Utilities Board (AEUB) issued a decision voiding its approvals of both the Alberta Electric System Operator’s (AESO) need assessment and general routing selection and AltaLink Management Ltd.’s (AltaLink) subsequent facilities application related to the proposed 500kV transmission reinforcement between Edmonton and Calgary ...

Lawson Lundell LLP | November 2007

In September, 2007 the AESO removed the 900MW threshold on wind power generation. In response to concerns about the Alberta system’s ability to absorb significant volumes of intermittent resources, in 2006 the AESO had capped wind facility interconnection to the Alberta system at 900MW until such time as appropriate mitigation measures were established to ensure wind power did not jeopardize system reliability ...

Lawson Lundell LLP | November 2007

On October 25, 2007 the Alberta Government announced a new royalty regime that will see a 20% increase in royalties for the development of the province’s non-renewable energy resources. Starting in 2009, oil and gas companies are expected to be paying roughly $1.4 billion more a year in royalties ...

Lawson Lundell LLP | November 2007

On March 15, 2007 BC Hydro filed its first general rate design application in 16 years (after a lengthy government imposed rate freeze that ended in 2003, an enquiry into the allocation of the benefits of BC Hydro’s low-cost Heritage Resources, two revenue requirements proceedings and its first comprehensive longterm resource planning review in this year) ...

dots